Inspection requests should be submitted to This e-mail address is being protected from spambots. You need JavaScript enabled to view it no less than 48-hours prior to the desired inspection time and may or may not require delays of up to seven (7) business days depending on City personnel schedules.  It is the Owner’s responsibility to contact the Utility as early as possible and maintain a schedule that will allow for City inspection.  Failure to allow inspection may result in rejection of work completed and require additional work to expose existing installations or complete reinstallation of the work at the Owner’s cost.  In general, the City will inspect projects continuously during the work but with limited staff, immediate response to projects is not always possible.